FAQs

Grid connection

The project’s offshore and onshore routes were chosen following a detailed assessment process, which is explained in Volume 1, Chapter 4: Site Selection and Consideration of Alternatives.

As part of the Holistic Network Design process, the Energy System Operator (ESO, now NESO) considered a range of possible grid connection points, including Stanah and Middleton. After assessing technical, environmental and practical factors, NESO concluded that a connection at Penwortham was the better option.

A connection at Stanah would require a new substation because there is limited space available at the existing site. The area is also surrounded by homes and recreational spaces, making access more difficult, and there are environmental constraints around Morecambe Bay. In comparison, Penwortham offers more space, fewer constraints and a stronger connection to the wider electricity network.

Onshore cable route corridor

This option was considered during project development and is discussed in Volume 1, Annex 4.1: Selection and Refinement of Cable Landfall.

The River Ribble estuary contains several nationally and internationally protected habitats and wildlife sites, including Special Protection Areas (SPAs), a Ramsar site, a Site of Special Scientific Interest (SSSI), a Marine Conservation Zone (MCZ) and a National Nature Reserve.

There are also significant technical challenges. The estuary has shallow water, large tides and unstable seabed conditions, making cable installation difficult and potentially unsafe. Construction could take much longer and could increase the risk of disturbance to sensitive habitats and protected species.

The chosen landfall at Lytham St Annes and cable route to Penwortham avoids these constraints as far as possible and reduces impacts on the Ribble estuary and its protected wildlife.

This approach is consistent with the Holistic Network Design, which identified the Ribble and Alt Estuary SPA as a sensitive area that should be avoided and concluded that a landfall near Blackpool Airport was the preferred option.

The temporary construction corridor needs to accommodate more than just the cable trench.

For Morecambe, the typical construction corridor width is 38 metres. This space is needed for construction access, temporary fencing, topsoil and subsoil storage, the cable trench itself and the machinery required to install the cables safely.

Further information is available in Volume 1, Chapter 3: Project Description.

Onshore substations

The project followed a detailed site selection process, including consideration of alternative locations. This process is set out in Volume 1, Chapter 4: Site Selection and Consideration of Alternatives and Volume 1, Annex 4.3: Selection and Refinement of the Onshore Infrastructure.

Because the substation needs to connect directly to the electricity transmission network at Penwortham and require a large amount of land, it was not possible to completely avoid Green Belt land.

The substation has been designed and located to reduce their visual impact as much as possible, supported by landscaping and planting. The project has also demonstrated through the Planning Statement that the substantial public benefits of delivering nationally significant renewable energy infrastructure outweigh the identified Green Belt impacts.

We recognise that the substation will be a visible new feature in the landscape and understand local concerns.

The site was selected to make use of existing landscape screening where possible and to maximise separation from nearby homes. Details of the site selection process can be found in Chapter 4: Site Selection and Consideration of Alternatives.

Additional landscaping measures are set out in the Outline Landscape Management Plan (OLMP) and the Outline Design Principles.

These measures include new planting and landscape earthworks designed to help screen the substation from key viewpoints and blend them into the surrounding landscape. The final appearance, layout and height of the substations must be approved by the relevant planning authority before construction can begin, in accordance with the granted DCO.

Environment

The project has been designed to avoid direct impacts on the Lytham St Annes Dunes SSSI. The cables will pass beneath the dunes using trenchless construction techniques, meaning there will be no open trench through the dunes and no direct loss of protected habitats.

The cable exit point on the beach will be located at least 100 metres seaward of the dunes, helping to protect this sensitive environment. As a result, the project’s assessments concluded that there would be no direct impact on the protected features of the dunes and no increase in flood risk due to construction.

Further information is available in the granted DCO and Volume 3, Chapter 2: Hydrology and Flood Risk.

Construction will inevitably generate some additional traffic. However, a detailed assessment was carried out across more than 150 kilometres of local roads to understand and manage potential impacts.

The assessment considered issues such as congestion, road safety, access for emergency vehicles, impacts on residents and effects on walkers, cyclists and horse riders. With the proposed mitigation measures in place, the assessment concluded that there would be no significant traffic effects.

To minimise disruption, the project has committed to using trenchless installation techniques, such as Horizontal Directional Drilling (HDD), at most major road and railway crossings. This means roads can remain open while cables are installed beneath them.

For more information, see Volume 3, Chapter 7: Traffic and Transport.

The project’s air quality assessment concluded that construction, operation and maintenance activities are not expected to result in significant air quality impacts.

Construction dust will be managed through detailed Dust Management Plans based on the Outline Dust Management Plan. These plans will include measures such as dust suppression, monitoring where required and controls on construction activities.

The assessment also found that traffic generated by the project is expected to have a negligible effect on local air quality.

Construction vibration was assessed as part of the project’s environmental assessment.

Where necessary, measures will be put in place to reduce vibration, including using lower-vibration equipment, limiting the duration of certain activities and installing damping systems to absorb vibration.

Detailed controls will be set out in Construction Noise and Vibration Management Plans, which must be approved before construction starts. Local residents and businesses will also be informed in advance of any works that could generate noticeable vibration.

Further details can be found in Volume 3, Chapter 8: Noise and Vibration.

The project assessed both construction and operational noise.

During construction, noise will be managed through approved Construction Noise and Vibration Management Plans. These plans will set out the controls required to minimise disruption and ensure compliance with relevant standards.

During operation, the substation will be subject to approved Operational Noise Management Plans. These plans will ensure that operational noise remains within agreed limits and that appropriate monitoring and mitigation measures are in place where required.

The project’s flood risk assessment concluded that the development will not increase flood risk when the proposed mitigation measures are in place.

Construction activities will be managed through a Code of Construction Practice, which includes measures to control flood risk and surface water management.

In addition, detailed Operational Drainage Management Plans will be prepared in consultation with the Environment Agency and Lancashire County Council. These plans will ensure that existing drainage systems are maintained or reinstated and that surface water is managed appropriately throughout the life of the project.

Further information is available in Volume 3, Chapter 2: Hydrology and Flood Risk.

Land and property

No. The project’s onshore cables will be installed underground, but they will not pass beneath residential or commercial buildings.

Detailed route plans can be viewed in the Onshore and Intertidal Order Limits Plan.

The project does not expect to affect property prices.

The Development Consent Order includes powers to acquire rights over land where necessary. However, any use of these powers is governed by established compensation legislation, and landowners are entitled to compensation where applicable.

The Government has published a series of plain-English guides explaining compulsory purchase and compensation, available here: Compulsory Purchase and Compensation Guidance.

Following construction, temporary working areas will be reinstated as close as reasonably possible to their previous condition.

The project has sought to minimise impacts on agricultural land throughout the route selection and design process.

Most agricultural land affected by cable installation will only be impacted temporarily during construction. Once the cables are installed and the land is restored, farming activities can resume above the buried cables.

The project has committed to restoring temporary working areas in line with recognised soil management guidance and good practice.

Permanent land take is mainly associated with the substation and environmental mitigation areas.

No. While parts of the project are located within Green Belt land, the majority of the cable corridor is required only temporarily during construction. Once construction is complete, these areas will be reinstated and returned to their previous use wherever reasonably practicable.

The route and substation locations were selected following an extensive alternatives assessment, including consideration of non-Green Belt options where feasible.

The project has also committed to landscape mitigation, habitat measures and land restoration requirements that are secured through the Development Consent Order.

Community benefits

Yes. We are committed to creating lasting benefits for the communities connected to the project. As part of this commitment, the project intends to establish two Community Benefit Funds (CBFs) to help ensure local communities share in the long-term benefits of the windfarm.

Throughout 2026, we have been carrying out a community consultation to better understand local priorities and aspirations. Independent grant management specialist GrantScape has been appointed to lead this process. GrantScape is gathering feedback from local residents, community groups and key stakeholders to help shape how the funds are structured, what types of projects they support and how funding is administered.

The feedback received will help ensure the Community Benefit Funds are designed to respond to local needs and deliver meaningful, lasting benefits for the communities closest to the project.

There are two funds available:

  • Substation Community Benefit Fund (Substation CBF) – Up to £530,000 will be made available during the project’s construction phase. This is expected to open for applications in 2027 at the earliest (subject to the project’s construction programme) and will support communities within a defined radius of the onshore substation located near Newton-with-Scales, Kirkham and Freckleton.
  • Annual Community Benefit Fund (Annual CBF) – An annual Community Benefit Fund of up to £200,000 will be available each year of the wind farm’s operation. This fund will support projects across a large area of Fylde and Blackpool, and small parts of Preston and South Ribble. It is expected that the wider fund will open for applications once the project is operational.

Yes. The project is expected to create employment opportunities during both construction and operation. The Environmental Statement identifies the potential for up to 255 full-time equivalent years of employment during development and construction and up to 50 full-time equivalent years during operation and maintenance.

The project must also prepare an Employment and Skills Plan before construction starts. This plan will set out measures to support local employment, training and skills development.

Further details can be found in Volume 4, Chapter 2: Socio-economics and the Outline Employment and Skills Plan.

Recreational spaces

Most of the beach will remain open during construction. Where work is taking place in a small, specific area, such as around compounds or cofferdams, only that immediate area will be fenced off. Public access to the rest of the beach will be maintained.

The Outline Public Rights of Way (PRoW) Management Plan provides further information about access arrangements at Lytham St Annes Beach.

Some activities on the beach, such as cable installation, cable pull-in and burial works, will require temporary closures of sections of the beach for short periods. Where this is necessary, managed crossing points will be provided on either the landward or seaward side of the works so people can continue to move along the beach safely.

The detailed arrangements for any temporary beach closures will be agreed with the relevant local authorities through the detailed PRoW Management Plan, which is secured through Requirement 8 of Schedules 2A and 2B of the granted DCO.

Public Rights of Way (PRoW), including footpaths, bridleways and cycle routes, will remain open wherever possible during construction. No Public Rights of Way will be permanently closed as a result of the construction, operation, maintenance or eventual decommissioning of the project.

Access will be managed in line with the measures set out in the Outline PRoW Management Plan.  In most locations, routes will stay open with clear signage and managed crossing points where construction traffic is present. Temporary fencing and gated crossings may be used where needed to ensure public safety.

Where access must be maintained through a construction area, clearly marked routes will be provided. Measures included in the PRoW Management Strategy are designed to minimise disruption to walkers, cyclists and horse riders throughout construction.

Detailed Public Rights of Way Management Plans will be prepared and agreed with the relevant local planning authorities in accordance with the outline plan and the detailed Code of Construction Practice. These requirements are secured through the granted DCO.

Once construction is complete, affected areas will be restored to as close as possible to their original condition, in line with the project’s commitments and relevant guidance.

The project will use trenchless installation techniques beneath Blackpool Road Recreation Ground. This means the cable will be installed underground without digging an open trench through the recreation ground, helping to reduce disruption.

For safety reasons, part of the recreation ground will need to be temporarily fenced off during construction. To help minimise the impact on local people, an Open Space Management Plan will be agreed with the local planning authorities through the granted DCO.

The project has also committed to putting measures in place to reduce disruption where needed. This could include temporarily relocating facilities or providing alternative amenities while construction is taking place. Discussions are ongoing with the relevant organisations to identify the best way to support users of the recreation ground.

Once construction is complete, the affected areas will be restored as close as possible to their previous condition.

The route for the onshore export cable was developed through a detailed site selection process, taking account of technical, environmental and community considerations.

As part of this process, the project committed to using trenchless installation techniques beneath several sensitive features, including the Lytham St Annes Dunes SSSI, Clifton Drive North, the railway and St Anne’s Old Links Golf Club. This means the cable will be installed underground without the need for open trenching through these locations.

The cable installation entry pits will be located at Blackpool Airport rather than on the golf course. This approach helps minimise impacts on the landscape, local communities and recreational facilities.

The use of trenchless installation beneath St Anne’s Old Links Golf Club forms part of a wider project commitment, with the same approach being used at a number of sensitive locations along the route. The project therefore does not consider that the golf course has received any preferential treatment, but rather that this approach reflects the agreed design principles applied across the scheme.